top of page
Dragonfly Skin Day Spa
Air Conditioning installation completed for a new day spa in Leeds city centre.
The engineers installed a 10kw ducted unit in the main reception and salon area. After multiple meetings and different designs of units, the customer decided to have the ducts as a main feature for their open ceiling to add to their modern design.
​
In the upstairs treatment rooms further design discussions with the customer were held to ensure we knew their vision and we specially sourced Toshiba Haori wall mounts as well as a hidden ducted system to add to their stylish interior design.
![Main Salon Ducted Unit](https://static.wixstatic.com/media/703ae3_0dd987d0168d41769245e0ebc9f1961d~mv2.jpg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/703ae3_0dd987d0168d41769245e0ebc9f1961d~mv2.jpg)
Main Salon Ducted Unit
![Reception Ducted Unit](https://static.wixstatic.com/media/703ae3_e5c2f3e3c60042728e10557d826d9961~mv2.jpg/v1/fill/w_980,h_700,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/703ae3_e5c2f3e3c60042728e10557d826d9961~mv2.jpg)
Reception Ducted Unit
![Waiting Area Ducted Unit](https://static.wixstatic.com/media/703ae3_6df51ee97e8d4a019951838bfcbd6446~mv2.jpg/v1/fill/w_640,h_1350,al_c,q_85,enc_avif,quality_auto/703ae3_6df51ee97e8d4a019951838bfcbd6446~mv2.jpg)
Waiting Area Ducted Unit
![Main Salon Ducted Unit](https://static.wixstatic.com/media/703ae3_0dd987d0168d41769245e0ebc9f1961d~mv2.jpg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/703ae3_0dd987d0168d41769245e0ebc9f1961d~mv2.jpg)
Main Salon Ducted Unit
1/7
bottom of page